How it works

From first advice to handover: how the process works

You have one fixed point of contact, and we guide you through each step: from advice and design to preparation, construction, transport, installation and aftercare.

9
steps, from first advice to handover
1 day
installation on site
1
fixed point of contact, also after you get the key
§ 01  ·  In brief
Phase 1 · Preparation

Getting to know you and designing

We discuss your situation, look at the site and the rules, and work out the model into a quotation.

Steps 01 – 05
Phase 2 · Building

Production and site preparation

The home is built in our own factory while the foundation and connection points are prepared.

Steps 06 – 07
Phase 3 · Installation

Installation, handover and aftercare

The home is installed and handed over. After that, we remain your point of contact.

Steps 08 – 09
§ 02  ·  Step by step

The nine steps to your garden home

01

Getting to know you

± 1 hour · free

We discuss your situation, wishes and planning.

Good to know

You speak straight away to the person who guides your project. They remain your fixed point of contact.

02

Looking at the site

on site

We look at the space, the access and the practical points to consider.

Good to know

Not sure whether it is allowed on your property? Do the free permit check first for a first indication per address.

03

Regulations

per address

We check which rules are relevant and whether further permit research is needed.

Good to know

If a permit is needed, we guide you through the application. The municipality decides on the application.

04

Design

floor plan and 3D

We work out the chosen model and the layout.

Good to know

A wheelchair version with wider passages is possible. Ask about it during the design stage.

05

Final quotation

before the start

You receive agreements on execution, price and planning.

Good to know

The quotation states what is included in the price and what varies per situation, such as the foundation and the connections.

06

Production

own factory

The home is built under controlled conditions in our own factory.

Good to know

You are welcome to come and see your home under construction. Call or email to make an appointment.

07

Site preparation

before installation

The foundation and connection points are prepared.

Good to know

The work in your garden is limited to the foundation and the connections.

08

Transport and installation

installation in one day

The home is brought to the site and installed.

Good to know

How the home gets into place depends on the access to your property. We look at that in advance.

09

Handover and aftercare

also after handover

We walk through the home with you and remain your point of contact for questions.

Good to know

Do the care needs change? Get in touch and we will look together at which adjustments are possible.

How long does the process take?

Installation on site is only one part of the whole process. The lead time depends on things such as design choices, a permit or assessment by the municipality, the production schedule, preparation of the site and access. After the first consultation, we can give you a realistic schedule for your situation.

Before we start

Is a garden home allowed on your property?

Do the free permit check for a first indication of what is possible at your address. In the end, the municipality assesses your application.

Take the free permit check

Discuss your situation with an adviser

Book a free consultation with no obligation. We discuss your wishes and look at the next step together.