From first advice to handover: how the process works
You have one fixed point of contact, and we guide you through each step: from advice and design to preparation, construction, transport, installation and aftercare.
Getting to know you and designing
We discuss your situation, look at the site and the rules, and work out the model into a quotation.
Production and site preparation
The home is built in our own factory while the foundation and connection points are prepared.
Installation, handover and aftercare
The home is installed and handed over. After that, we remain your point of contact.
The nine steps to your garden home
Getting to know you
± 1 hour · freeWe discuss your situation, wishes and planning.
You speak straight away to the person who guides your project. They remain your fixed point of contact.
Looking at the site
on siteWe look at the space, the access and the practical points to consider.
Not sure whether it is allowed on your property? Do the free permit check first for a first indication per address.
Regulations
per addressWe check which rules are relevant and whether further permit research is needed.
If a permit is needed, we guide you through the application. The municipality decides on the application.
Design
floor plan and 3DWe work out the chosen model and the layout.
A wheelchair version with wider passages is possible. Ask about it during the design stage.
Final quotation
before the startYou receive agreements on execution, price and planning.
The quotation states what is included in the price and what varies per situation, such as the foundation and the connections.
Production
own factoryThe home is built under controlled conditions in our own factory.
You are welcome to come and see your home under construction. Call or email to make an appointment.
Site preparation
before installationThe foundation and connection points are prepared.
The work in your garden is limited to the foundation and the connections.
Transport and installation
installation in one dayThe home is brought to the site and installed.
How the home gets into place depends on the access to your property. We look at that in advance.
Handover and aftercare
also after handoverWe walk through the home with you and remain your point of contact for questions.
Do the care needs change? Get in touch and we will look together at which adjustments are possible.
How long does the process take?
Installation on site is only one part of the whole process. The lead time depends on things such as design choices, a permit or assessment by the municipality, the production schedule, preparation of the site and access. After the first consultation, we can give you a realistic schedule for your situation.
Is a garden home allowed on your property?
Do the free permit check for a first indication of what is possible at your address. In the end, the municipality assesses your application.
Take the free permit checkDiscuss your situation with an adviser
Book a free consultation with no obligation. We discuss your wishes and look at the next step together.